Quotes
Plumbing quotes: mandatory details in 2026
8 Oct 2026 · 7 min read
Language
Quotes
The items to allow for, the details not to forget, the VAT rate to check line by line (5.5%, 10% or 20%, depending on the conditions), the customer’s certification, how to discuss financial support without outdated figures, and an entirely fictional worked example.
These pages describe French rules. The translations do not constitute an adaptation to the law of another country.
A heat pump is rarely sold on price alone: the customer compares equipment, financial support and VAT that varies with the installation. A good quote makes all three clear. This template sets out the items to include, details not to forget, VAT rates to check line by line and a worked example. The example’s names, prices and addresses are fictional; the template does not replace your insurer or accountant.
Typical items. An air-to-water or ground-source heat pump is set out in separate lines, each with its quantity and unit price excluding VAT: the technical visit and sizing assessment (state whether it is free or chargeable), and the sizing report to give to the customer (Annex IV to the French General Tax Code, Article 30-0 D ter); supply and installation of the heat pump, with its make, model and output; outdoor unit support (mounts, slab or wall bracket); hydraulic connections, isolation valves and insulation; flushing or rinsing the existing circuit and the filter; controls and outdoor sensor; dedicated electrical supply and its protection at the consumer unit; condensate drainage; commissioning, adjustments and handover of the manual; removal and disposal of the old appliance; the hot water cylinder, if included. A “miscellaneous equipment” line tells the customer nothing, and tells the authorities nothing.
Mandatory details. These are the same as for any plumbing and heating quote for a private customer: the date, your identity and SIREN, the worksite address, details of each line, totals excluding and including VAT with the VAT rate, the validity period, whether the quote is free or chargeable, the French ten-year liability insurance certificate, the consumer mediator’s contact details and, if the quote is signed at the customer’s home or remotely, the fourteen-day withdrawal right. The guide “Plumbing quotes: mandatory details in 2026” explains each one. For a heat pump, add the appliance’s exact reference. If you handle refrigerants, you must hold the certificate of capacity required by the French Environmental Code.
VAT, line by line. The reduced rate requires a home completed more than two years ago and work which, over a period of no more than two years, neither contributes to producing a new building nor increases the floor area of the existing premises by more than 10% (BOI-TVA-LIQ-30-20-95, § 1, 10 and 50). For an air-to-water or ground-source heat pump meeting the criteria in Annex IV to the French General Tax Code (Articles 30-0 D to 30-0 D nonies, introduced by the order of 4 December 2024 and last amended by the order of 14 August 2026), the rate is 5.5 % on supply and installation as a standalone installation. If the heat pump is combined with a gas or oil boiler as a supplementary heat source (a hybrid heat pump), reduced rates do not apply and the transaction is invoiced at 20 % (same BOI, § 70). An air-to-air heat pump does not qualify for 10 %; a reversible pump meeting the technical criteria may qualify for 5.5 % (see “Boiler replacement: which VAT rate in 2026?”). Work that is not energy renovation, or does not meet the criteria, remains at 10 % if it improves or maintains the home, subject to the exclusions applicable to certain major items of equipment; equipment sold without installation remains at 20 %. Work ancillary to installation (removing the old appliance, connections and making good the room) follows the heat pump’s rate. An unrelated service requested in addition retains its own rate, even on the same quote (replacing a tap elsewhere in the house, for example). But if the transaction combines several main works at different rates, the highest rate applies to the whole transaction (BOI-TVA-LIQ-30-20-95, § 20). If in doubt about a line, ask your accountant before sending the quote.
The certification statement. The customer certifies on the quote or invoice that the work concerns a home completed more than two years ago, does not, over a period of no more than two years, contribute to creating a new building or increase the floor area of the existing premises by more than 10%, and qualifies as energy renovation for the 5.5% rate. Ensuring compliance with the technical criteria remains your responsibility. In Okivo, have these conditions certified at the quote stage to secure the documentation. The administrative templates also provide for certification on the invoice, notably through its payment: this does not remove the need to have the required supporting document in time. The guide “VAT at 10% or 5.5%: the customer's certification statement” details the procedures and the simplification allowed for certain small repair and maintenance jobs.
Financial support, without figures. Energy renovation schemes (MaPrimeRénov’, energy savings certificates, the zero-interest eco-loan) have conditions and amounts that are regularly revised: do not put any amount on the quote as though it were guaranteed. Tell the customer that eligibility depends on their circumstances and the equipment chosen, and direct them to the public France Rénov’ service (france-renov.gouv.fr) and service-public.fr to check the rules in force on the day they apply. For most schemes, the application must be submitted before the quote is signed or work starts, and some require an RGE-qualified professional: warn them before they sign.
A numerical example, entirely fictional. At a fictional customer’s home, a house built in 1985 in Lyon’s 3rd arrondissement, an old electric boiler is replaced with an 8 kW air-to-water heat pump, without a backup boiler. Prices are indicative. At 5.5%: 8 kW air-to-water heat pump, outdoor unit and hydraulic module, supply and installation, €7,200.00 excluding VAT; outdoor unit support and anti-vibration mounts, €380.00 excluding VAT; hydraulic connections, isolation valves and insulation, €1,150.00 excluding VAT; flushing the existing circuit and filter, €420.00 excluding VAT; controls and outdoor sensor, €380.00 excluding VAT; dedicated electrical supply and protection, €540.00 excluding VAT; commissioning, adjustments and handover of the manual, €290.00 excluding VAT; removal and disposal of the old boiler, €480.00 excluding VAT. Subtotal at 5.5%: €10,840.00 excluding VAT, giving €596.20 VAT. At 10%: replacement of the kitchen sink mixer tap, requested additionally by the customer, supply and installation, €260.00 excluding VAT, giving €26.00 VAT. Total: €11,100.00 excluding VAT, €622.20 VAT, €11,722.20 including VAT. The quote includes the certification statement, its validity period, payment terms and details of the attached ten-year liability insurance certificate.
After signing. An accepted quote binds both parties. If the contract is concluded remotely or off-premises with a private individual, the customer generally has fourteen days to withdraw. To start during this period, obtain their express request; for an off-premises contract, it must be on paper or another durable medium. The right of withdrawal is only lost after full performance, with the required consents and acknowledgement. For an off-premises contract, do not receive any payment before seven days have elapsed, unless a statutory exception applies. The guide “Getting a quote signed online: what value, what proof?” explains the precautions. Deposits are invoiced separately.
In Okivo, the plumbing and heating library includes the items for a heat pump with their VAT rates (5.5% for energy-renovation equipment, 20% for supply only and air conditioning). The customer certification is added to the quote when a line is at 10% or 5.5%, and the pre-send check flags a gas or oil boiler or supply without fitting that has been entered at the reduced rate. You remain in control of every line: checking the rate one last time is your responsibility.
Sources: French General Tax Code, Articles 278-0 bis A and 279-0 bis; Annex IV of the CGI, Articles 30-0 D to 30-0 D nonies, introduced by the Order of 4 December 2024 and most recently amended by the Order of 14 August 2026; BOFiP BOI-TVA-LIQ-30-20-95 (current version, published on 9 September 2026), paragraphs 1, 10, 20, 70 and 80; Order of 24 January 2017 (Légifrance); French Environmental Code (certificate of capacity for refrigerants); France Rénov’ and service-public.fr for financial assistance.
Quotes
8 Oct 2026 · 7 min read
VAT
4 Oct 2026 · 7 min read
Quotes
25 Sept 2026 · 5 min read